Authored design — 2026-09-15. Section 4. This cascade elaborates the existing checklist item. It is not a dispatch, implementation receipt or completion verdict. Work outside WM-01–14 still requires Joe’s explicit greenlight; having a cascade is necessary but not permission.
Section 3/4 index · Exact TODO · Cascade JSON
The qualifying claim requires one real timestamped run and Lean-computed validation of its certificate. Combining unrelated component successes cannot establish that occurrence.
E05 — Qualifying timestamped run + Lean validation. OPEN: every required node and connection positively validated at the specified meaning, actual real work, retained inputs/outputs and independently computed certificate. Machinery r8 and annotation A8 cannot replace this.
This is the checklist’s dated evidence account, not a new deployment census. Existing source/test evidence keeps its bounded credit. The acceptance obligation above governs this design.
Pattern: wm-qualifying-run/criterion-before-outcome
Retain the authorized task, its participant-relevant criterion and input boundary before the outcome. Verify readiness against every required node and connection; a run with unvalidated nodes remains a machinery test.
Pattern: wm-qualifying-run/one-episode-all-required-connections
When separately authorized, retain actual selection, enactment, observation and continuation with full policy/model identities. On-demand operation is sufficient under the ruling; cron is not added as a prerequisite.
Pattern: wm-qualifying-run/one-episode-all-required-connections
Acquire all mandatory nodes/edges from this episode through TRACE/E02, plus independent outcomes and exact review commissions. Refuse substitution of r8, annotation A8 or another episode for missing evidence.
Pattern: wm-qualifying-run/certificate-and-world-must-meet
Generate and check the authentic certificate using the admitted Lean predicates. Retain both artifacts: the timestamped real run and Lean-computed validation, with independent semantic review and Joe’s acceptance of the qualifying fact.
Each node’s stated artifact is the input or constraint for the related node below. These are design dependencies, not a claim that a runtime scheduler automatically fires patterns. Existing WM producers are reused through the linked contracts; no second implementation is implied.
| From | To | Relation | Reason |
|---|---|---|---|
| E05-1 | E05-2 | requires-result | A predeclared real criterion determines what the authorized episode must accomplish. |
| E05-2 | E05-3 | requires-result | The actual episode supplies the evidence population, without borrowing another run. |
| E05-3 | E05-4 | requires-result | Complete same-run evidence is the subject for formal and independent validation. |
| E05-4 | E05-1 | revision-feedback | A failed distinguishing control or consumer mismatch reopens the original scope/meaning; retain the failed claim rather than weakening it. Relevant controls: Reject unvalidated node, unfired mandatory edge, changed criterion, cross-run borrowing, fake enactment and negative certificate relabeled positive. Test the checker before claiming the real success. |
Retain the actual subject, source/model revision, task/occurrence, cutoff, producer and consumer for each interface. A missing field is a named gap; a default that changes the meaning is not an adapter. Reuse existing records where they satisfy these obligations. If a new component is indispensable, identify its exact TODO/cascade clause before seeking a separately bounded implementation instruction.
A machinery run reaches a successful stop line and emits a truthful false certificate. This can validate the detector, but E05 still lacks the all-node working episode and its positive validation.
This is a distinguishing design example, not a claimed production experiment.
Distinguishing controls: Reject unvalidated node, unfired mandatory edge, changed criterion, cross-run borrowing, fake enactment and negative certificate relabeled positive. Test the checker before claiming the real success.
Closure rule: every part of the quoted obligation must be supported by the indicated artifacts and actual connections. A useful rejection proves the rejecting boundary only. One accepted subclause does not tick the whole item. A bellback must supply the exact reviewed subject, executed checks, independent verdict and remaining clauses.
E01 · E02 · E03 · E04 · TRACE · E10
Execution is not greenlit by this design. Readiness evidence and a separately authorized run are required; remaining Holes obligations cannot be waived.
Dependency links describe required interfaces; they do not authorize work on those items. No implementation outside the existing TODO list is approved. Publication does not select a numerical law, settle an unresolved operator ruling or authorize a run.
All seeded patterns are applied above. The JSON pins their source bytes and the governing checklist/rulings. Historical formulas, thresholds and examples in a pattern remain scoped examples unless the governing contract adopts them. This draft adds no pattern-library entries and claims no independent semantic ratification.